Panel upgrades and service capacity
Room for an EV charger, heat pump or hot tub.
Fuse box, crowded panel or not enough power for what's next? We run a load calculation first: sometimes a 100 to 200 amp upgrade is the answer, and sometimes load management solves it for less. Most panel swaps take a single day, power off in the morning and back the same day, and we can work to your insurer's deadline if they've flagged the panel.
Before
Fuse box or a full 100 amp panel
After
Capacity for what's next, ESA inspected
